Page
|
Link
|
Description
|
6-02
|
Emp 06-02 Step 6
|
Orientation of flush rivets on the doubler
|
6-02
|
VS-702 Trimming Goof
|
|
6-02
|
Match drilling 1/4 hole
|
Issue match drilling VS-01401 1/4 hole
|
6-03
|
Vertical Stabilizer Nose Rib Fit
|
|
6-03
|
Use of "TYP" in the plans
|
|
6-04
|
|
Also scuff the hinge brackets, easier to do it now than when painting
|
6-05
|
Riveting forwardmost most rib
|
Issue with rivet sitting flush
|
6-05
|
Riveting forwardmost most rib
|
Issue with setting rivets
|
6-05
|
Issues riveting VS-705/VS-704/VS-703PP
|
Discussion on trouble setting some rivets in the Forward Spar # 803pp and the two bottom Ribs #'s 704 and 705
|
6-05
|
Riveting Front Spar VS-705/VS-704 to VS-702
|
Discusses problem with Rivets folding over
|
6-05
|
Riveting Front Spar VS-705/VS-704 to VS-702
|
Using a long rivet set and bucking bar
|
6-05
|
VS-411PP Riveting Technique
|
|
6-05
|
VS-410PP Riveting Technique
|
|